This project involved the decommissioning and modification of sections of the existing irrigation system to accommodate new infrastructure and ensure compatibility with the upgraded layout. Works included integrating new irrigation components with the retained school system, requiring careful coordination to maintain functionality across both new and existing areas.
The team installed additional components to expand the automatic irrigation system, ensuring adequate coverage across newly developed areas of the site. This included modifications, connections and interfacing works to seamlessly link into the existing network.
All installed systems were thoroughly tested and commissioned to ensure reliable operation, correct coverage and efficient water distribution. The result is a fully integrated irrigation system that supports both the new development and the existing school grounds.
The project delivered a seamless extension of the existing irrigation system, ensuring consistent performance across both new and retained areas of the school. Improved system integration allows for efficient water distribution and reliable operation, supporting the long-term functionality of the site.
The upgraded infrastructure ensures the new stage of the school is supported by a modern irrigation system, contributing to healthy, well-maintained outdoor spaces for students and staff. By carefully integrating with the existing system, the works minimised disruption while maximising the value of retained infrastructure.