The project involved a full assessment and upgrade of the existing irrigation system to improve coverage and uniformity across the playing surface. The new system was integrated with the existing 230kL holding tank, maximising the use of available water resources and supporting more efficient irrigation scheduling. Upgraded infrastructure included the installation of a durable MDPE poly mainline to ensure long-term reliability, along with new Bermad control valves to enhance system control and performance. This was complemented by PVC lateral pipework and high-performance Hunter Industries sprinklers, delivering more precise and consistent water distribution across the oval.
The upgraded system has significantly improved water coverage, resulting in more consistent turf quality and enhanced playability for local clubs and community use. Increased irrigation efficiency has reduced water waste while improving overall system performance. By integrating with existing water storage and upgrading key components, the project delivers a reliable, long-term solution that supports ongoing use of the facility. It also reinforces the City of Kalamunda’s commitment to sustainable water management and maintaining high-quality sporting infrastructure.