Latest

Projects

Thomas Oval

Client

City of Kwinana

Scope of Works

This project involved the full delivery of a comprehensive irrigation upgrade, with a strong focus on safety, efficiency, and long-term performance. Works included the identification and verification of all existing underground services, implementation of safe work practices in accordance with relevant regulations, and the coordination of traffic management to minimise disruption on site. The team supplied and installed all specified irrigation and electrical components, utilising poly ploughing techniques to efficiently install pipework with minimal ground disturbance. This method allowed for faster installation, reduced reinstatement requirements, and less impact on surrounding turf areas. All systems were then calibrated and thoroughly tested to ensure optimal performance, with detailed documentation and as-constructed records provided upon completion.

Benefits / Results

The project delivered a modern, efficient irrigation system through the replacement of outdated infrastructure. An improved system design now allows individual playing surfaces to be irrigated independently, providing greater control and flexibility. Enhanced irrigation coverage has also resulted in a more efficient system overall, reducing water usage while maintaining high-quality turf conditions.